Novelty Spain, a Barcelona-based event production company and part of Groupe Novelty, designed and ran the lighting, sound, video and rigging for an exclusive corporate event for more than 90 guests at Llotja de Mar, one of Barcelona's landmark heritage venues. The production spread across three spaces of the building, ran from a single control position and did not use a single fixing point on the historic structure.
Bringing an event to a heritage venue in another country raises a fair question: will the local partner protect both the building and your standards? Here the answer had to be yes on both counts, with guests expecting the same technical quality they would get in a five-star hotel.
The brief at Llotja de Mar was to turn the Sala de Contrataciones, the entrance tunnel and the inner courtyard into one seamless guest journey. Out of confidentiality and respect for our clients, we sometimes cannot say who is behind an event. We can tell you how we delivered it.
Llotja de Mar is one of Barcelona's most striking unique venues, and its Gothic Sala de Contrataciones makes an impression on its own. That is exactly why any technical production inside it starts with firm limits: a protected structure, controlled loads and a build that must leave no trace.
The event added two conditions. The production covered three connected spaces, each with its own role and atmosphere. And the schedule meant building, rehearsing and running the show in a single day, followed by a fast load-out.
For an international agency, that combination is where a local partner proves its worth. Everything was designed on drawings during pre-production, so the plan was closed before the first truck arrived.
We treated the event as one system. Lighting, sound and video were all run from a single FOH position, linked to every space over fibre and a Luminex GigaCore network. One control point for three different atmospheres meant precise cues and one point of technical responsibility for the agency.
The first challenge was solved through structure. Our team designed a ground-supported modular rigging system with no fixings to the building: more than 16 metres of truss, eight towers and fully integrated cable distribution.
The towers held fixtures and screens at the right height while keeping the arches and columns in view. For the criteria behind this kind of decision, read our guide on how to choose a rigging supplier for corporate events, or see our truss and rigging rental.
LED screens between the columns of the Sala de Contrataciones · Source: Novelty Spain
Lighting had two jobs: set the mood of the evening and bring out the architecture. We designed a rig of more than 60 premium fixtures. On the towers of the Sala de Contrataciones we combined:
In the courtyard, wireless uplighters, custom gobos and ETC profiles lit specific areas without running cable across the floor. Everything was programmed and run from grandMA3 and Obsidian consoles, with dedicated scenes for each part of the event. See our event lighting rental.
Inner courtyard of Llotja de Mar · Source: Novelty Spain
Stone walls and high ceilings are hard on sound, so one system was never going to be enough. We designed two independent PA systems, one indoors and one outdoors.
The Sala de Contrataciones had an L-Acoustics Syva system: clear, powerful coverage with a slim profile that respects the look of the room. In the courtyard, a Meyer Sound system carried live music and speeches with full clarity.
Shure wireless microphones, centralised control and Dante networking between spaces completed the setup, so any audio signal could be routed between areas from the FOH. More on our sound equipment rental.
The visual centrepiece was an 8 x 4 m LED screen with a 2.6 mm pixel pitch, framed by two side LED towers that extended the image and wrapped the room.
Content ran on Mitti servers, with presentation switching on an Analog Way Zenith 200 and cue control through MasterCue. Confidence monitors, auxiliary screens and digital signage helped guests find their way. All of it sat on a redundant 4K signal path, so no single failure could reach the screen. Explore our LED screen and video equipment rental.
Light beams and LED screens in the Sala de Contrataciones · Source: Novelty Spain
Guests experienced the evening as one continuous story: from the entrance tunnel to the Sala de Contrataciones and out to the courtyard, with light, sound and content changing in step with the programme.
The agency worked with a single technical partner for every discipline and a plan closed in pre-production. From brief to load-out, every timing was met to international standards. It is the same approach we bring to other Barcelona landmarks, such as the gala dinner we produced at the Maritime Museum of Barcelona.
With more than 40 years of experience and our own 8,000 m² warehouse, Novelty Spain supports international agencies and brands across the full scope of event production in Spain: lighting, sound, video and rigging designed together, with one contact and a plan closed in pre-production. We know Barcelona's unique venues and their rules, and we tailor each proposal to the architecture, the programme and the budget.
Bringing a corporate event to a heritage venue in Barcelona? Tell us about your project and we will send you a tailored technical proposal and quote, fast.